Salesforce Refresh and Readiness Checklist (Worksheet)
Work through this after a refresh completes and before the test window opens. Scale it to what the change can break: a narrow low-impact change needs a focused subset; a permissions, integration or data-model change needs the full set.
Completing this worksheet does not guarantee a safe release. It records which checks were performed, by whom, with what evidence, and what was deliberately left unverified.
Companion worksheet to Salesforce Sandbox Management: Reduce Release Risk Without Slowing Delivery.
Before the refresh is requested
- ☐ Active unfinished work in the target environment is identified and listed
- ☐ Unmerged metadata is preserved outside the environment
- ☐ Required fixtures and scenario data are exported or reproducible
- ☐ A quiet window is agreed with everyone currently using the environment
- ☐ Activation owner is named
- ☐ Refresh eligibility date is confirmed for this sandbox type
- ☐ Dependencies on other in-flight refreshes are checked (same-type requests can queue)
Activation replaces the sandbox being replaced, including its current configuration and data changes. Preservation happens before activation, not after.
Readiness checks after activation
| ID | Check | Owner | Expected result | Observed result | Status | Evidence ref | Checked at | Limits |
|---|---|---|---|---|---|---|---|---|
| R01 | Preserve unfinished work and required fixtures | ☐ | ||||||
| R02 | Confirm metadata baseline and scenario scope | ☐ | ||||||
| R03 | Verify representative related synthetic data | ☐ | ||||||
| R04 | Verify intended tester access (not admin access) | ☐ | ||||||
| R05 | Confirm outbound isolation and approved receivers | ☐ | ||||||
| R06 | Inspect integration configuration and required jobs | ☐ | ||||||
| R07 | Run business outcome assertions as the intended role | ☐ | ||||||
| R08 | Record recovery owner and readiness decision | ☐ |
R01 to R06 inspect configuration and preparation. Only R07 establishes that the business scenario works end to end. A worksheet with R01 to R06 complete and R07 unchecked has not established readiness.
Known post-refresh gaps worth checking explicitly
- ☐ Local external client apps — not copied during clone or refresh; packaged ones are. Reconfiguration owner named ....................................
- ☐ Email deliverability setting — new and refreshed sandboxes default to System email only. Actual setting observed ....................................
- ☐ Intended tester login verified by that person, not on their behalf ....................................
- ☐ Scheduled jobs and settings deliberately re-enabled or deliberately left off ....................................
- ☐ Any post-copy automation: distinguish compiled, unit tested, and observed in a real post-copy run ....................................
Readiness decision
Record one outcome and the reason.
- ☐ Ready — the checks that matter for this change passed, with evidence referenced above.
- ☐ Hold — something required is missing. What is missing .................................... Who clears it ....................................
- ☐ Ready with declared limits — testing may proceed. Not verified: ....................................
Decision owner .................................... Date .................................... Change being tested ....................................
References
Salesforce documentation, checked 16 November 2026: