# Salesforce automation continuity assessment worksheet

Use this as a proposed management checklist. It is not a Salesforce standard or an org-testing authorization.

## Define the inventory

Name each business-critical workflow once, even when it uses several Flows, Apex components or integrations. Record the inventory date, criticality rationale, business owner, relevant metadata/version references and downstream systems. Retain additions and removals between reporting dates.

## Assess demonstrated support

For each workflow record the primary and backup maintainer, their authorized access, assessment date, assessor, supporting evidence and scope limitations. A proposed handover criterion is that the maintainer can:

1. Explain the trigger, intended outcome and exceptions.
2. Identify material dependencies and the business rule owner.
3. Propose a bounded change and identify affected stakeholders.
4. Explain repeatable verification of expected and failure outcomes.
5. Explain containment, recovery, reconciliation and escalation.

Record whether this was a document walkthrough, a non-production exercise or an actual retained test. A walkthrough does not prove execution. Agree criteria and evidence freshness before classifying people. Reassess after material changes.

## Classify every workflow

- A: Exactly one demonstrated maintainer.
- B: Two or more demonstrated maintainers.
- C: Zero demonstrated maintainers after assessment.
- U: Unknown or not assessed; insufficient evidence to classify.

N = A + B + C. Total inventory = N + U.

SMER = 100 × A / N. Coverage = 100 × N / (N + U).

If N = 0, SMER is undefined: report “no assessed workflows,” not zero percent. If total inventory = 0, coverage is undefined and the inventory scope needs review. A move from A to C reduces SMER while worsening continuity; retain all four counts.

Example: A=6, B=3, C=1, U=2. SMER=60%; coverage=83.3% (83% rounded). These are invented inputs.

## Turn findings into decisions

For each gap record business consequence, proposed action, accountable owner, target date, required permission and acceptance evidence. Rank by consequence and recovery capability; do not use an unsupported universal traffic-light threshold. Recheck the baseline quarterly as a starting cadence, and after material releases or staffing changes.

Keep completed worksheets private. They can reveal sensitive architecture, staff dependencies and operational weaknesses.
