Salesforce automation continuity assessment worksheet

Use this as a proposed management checklist. It is not a Salesforce standard or an org-testing authorization.

Define the inventory

Name each business-critical workflow once, even when it uses several Flows, Apex components or integrations. Record the inventory date, criticality rationale, business owner, relevant metadata/version references and downstream systems. Retain additions and removals between reporting dates.

Assess demonstrated support

For each workflow record the primary and backup maintainer, their authorized access, assessment date, assessor, supporting evidence and scope limitations. A proposed handover criterion is that the maintainer can:

  1. Explain the trigger, intended outcome and exceptions.
  2. Identify material dependencies and the business rule owner.
  3. Propose a bounded change and identify affected stakeholders.
  4. Explain repeatable verification of expected and failure outcomes.
  5. Explain containment, recovery, reconciliation and escalation.

Record whether this was a document walkthrough, a non-production exercise or an actual retained test. A walkthrough does not prove execution. Agree criteria and evidence freshness before classifying people. Reassess after material changes.

Classify every workflow

N = A + B + C. Total inventory = N + U.

SMER = 100 × A / N. Coverage = 100 × N / (N + U).

If N = 0, SMER is undefined: report “no assessed workflows,” not zero percent. If total inventory = 0, coverage is undefined and the inventory scope needs review. A move from A to C reduces SMER while worsening continuity; retain all four counts.

Example: A=6, B=3, C=1, U=2. SMER=60%; coverage=83.3% (83% rounded). These are invented inputs.

Turn findings into decisions

For each gap record business consequence, proposed action, accountable owner, target date, required permission and acceptance evidence. Rank by consequence and recovery capability; do not use an unsupported universal traffic-light threshold. Recheck the baseline quarterly as a starting cadence, and after material releases or staffing changes.

Keep completed worksheets private. They can reveal sensitive architecture, staff dependencies and operational weaknesses.